Skip to Content

PROJECT BRIEF · BEFORE PRODUCT

Starting from the project conditions,
Find the right material.

An effective consultation at least includes space, grassroots, problems and time.

Let’s start by organizing the information into a list of items that can be discussed. When hollowing, water seepage, structural cracks and wet area nodes are involved, on-site inspection is still required.

01 / PROJECT BRIEF

one minute,
Organize your project information.

After filling in, a project summary will be generated locally and attempted to be copied. The webpage will not upload your information; please send the summary and on-site photos to WeChat and we will continue to judge.

phone132 5167 0000Can be dialed directly
WeChat116774007

02 / PHYSICAL SAMPLE

Let the entity template,
Help you make decisions.

Before applying for a sample, please prepare photos of the space, main materials, lighting color temperature and preferred color direction. Sample specifications, costs, inventory and delivery range are subject to actual confirmation during communication.

PHOTO

space and light photos

One group each for day and night, including window direction and main lighting.

MATERIAL

Adjacent materials

Physical samples of woodwork, stone, metal, flooring or soft furnishings.

CONDITION

Base and purpose

The location of walls and floors, whether there is a wet area, the flow of people, and the status of the existing grassroots.

This page only organizes text in your browser and will not automatically upload or send it. Please confirm the summary content yourself and contact us via WeChat 116774007 or phone 132 5167 0000.